More LED information, please click Real Green Lighting Company Limited
Installation Tools:
Drill, hammer, crimp cap, special crimping pliers, electric iron, tape measure, Sawyer, saw blades, yarn gloves, herringbone ladder, digital multimeter.
Installation conditions:
1, complete construction drawings and technical data;
2, roof, floor construction is completed, no leakage;
3, ceiling, wall plaster, interior painting and land clearing work has been completed;
4, embedded parts and holes for compliance with design requirements;
5, related to the return pipe line laid in place, threading checked.
Installation process:
Check fixtures - assembly fixture - lighting installation - power test run
1, lamp examination
Check the installation site according to market lighting fixtures to meet the requirements; according to case, check the installation accessories; pay attention to check the manufacturer's technical documents are complete; check lamp appearance is normal, with or without scratches, deformation, metal loss, corrosion and other phenomena.
2, assembly fixtures
Follow the installation instructions to a member fused within the lamp's length should be suitable for threading, multi-strand cord thread should the lining of tin, attention should be unified wiring colors, easy to distinguish the line of fire with the zero line. Straighten out the lights inside the lines.
3, lighting installation
Normal type lamp installation: After the power cord and keep adequate maintenance and stripping length cut off more than the first outlet header, connector screws lamp socket mounted on the junction box.
Dropping style lamp installation: After the power cord and keep adequate maintenance to cut off more than the length of the line and outlet header stripping the wires through the lamp base, the base is fixed with a screw connection on the terminal box. Take some light line, at one end connected to the lamp shall be fastened insurance deduction within the lamp, the lamp base to penetrate the other end of the line tureen, light line is good insurance deduction in the tureen and crimp cap connected to the power cord on the base, screw the buckle bowl.
4, power test run
Turn on the power, the test has power.
Lighting installation Note:
1, well insulated, especially in humid environments such as bathrooms and kitchens, insulation done well prone to short circuits.
2, in particular the large lamps lighting glass products, the installation must use steel expansion screws hanger tied (iron expansion pin), not the first punch, then tighten the screws into the wooden wedge fixed, this approach only applies to fixed lateral wall, does not apply to top. Not recommended to use plastic expander, expanding over time because the plastic will be aging.
3, No. 6 in advance to prepare some Luo mother, because when the lights installed will encounter such a situation: When loading chassis, Luo mother because the original one is sealed, it is screwed to a certain extent twist does not move, not pull its weight would be more, in which case you can be unscrewed a 6 Luo mother and pull its weight, then tighten the original Luo mother, so not only beautiful but also to avoid the chassis can not be completely consistent with the top surface.
No comments:
Post a Comment